St. Margaret’s Residence
Magdalen Rd, EX2 4BJ

N&G Groundworks Ltd have been appointed, by LEAN, as their nominated groundworks sub-contractor. As part of the redevelopment of the former school, dating back to the 1920s. Where by LEAN is redeveloping the Grade II and Grade II* listed buildings, into energy efficient homes for Grenadier Estates. Apart of our package we are to undertake the following:
- Site wide reduce level excavation and disposal.
- Installing new foundations and internal drainage runs within existing building.
- Excavating and lay new adoptable drainage and forming new connections to the existing sewer system.
- New service trenching for the specialist energy efficient systems.
- External works.
Redevelopment
of Grade II and Grade II* listed buildings
£420k
approx. value.
Restricted
access