N&G Groundworks Ltd were contracted by CG Fry & Son to carry out the groundworks and civil engineering on this project.
This development delivered 13 new homes to the community, delivering a mixture of two, three and four-bedroom houses.
Click on the photos to enlarge:
£0.70m
Contract
Dec 2016
Completed
13
New Homes
N&G Groundworks Ltd package included Section 278 and 38 works, all infrastructure works, comprising of reduce level excavations and disposal of excavated material off site.
Construction of foundations, substructure brick and blockwork, large in-situ RC retaining walls, beam and block flooring and external finishes. Apart of the Sustainable urban Drainage scheme, we were required to install a Weholite tank system.